Technology For Manpower – Intensive Care

The HPF – Technology Adoption Scheme supports Community Care partners that are keen to adopt technology that will reduce the amount of time and effort required to perform manpower-intensive care processes.

Funding

The scheme funds up to 85% of the approved project cost. The funding is on a reimbursement basis and covers a one-time project set up cost which includes manpower, training, capital cost, retrofitting, etc. Funding for each project is capped at $300,000 and service providers will be given up to one year for project completion.

Research, prototypes, pre-commercialised products, IT systems, ongoing operating cost, consumables and GST will not qualify for funding.

AIC does not endorse any particular brand or model. Service providers are encouraged to assess the brand or model based on their needs, and to purchase the equipment in accordance with their internal procurement guidelines.

Application

Project application is open throughout the year. Projects will be evaluated for their feasibility, scalability, sustainability, productivity and other outcomes.

Closing date of award period

  • 30 September
  •  31 December
  •  31 March
  •  30 June

Key information to include in applications:

  • At least 10% productivity improvement in terms of staff man-hour savings
  • Number of clients/staff benefitting from the project
  • Current and proposed changes, including number and type of staff involved
  • Detailed breakdown of the project costs
  • Time Motion Study and Cost Benefit Analysis
  • Minimum of 3 vendor quotations
  • Justification for selecting a particular model/ consultant

To apply, please contact us for the HPF application form(s). Only completed application forms with the required details will be accepted.

Green Lane

Green Lane is an express application track for equipment or services with proven productivity outcomes and pre-determined purchasing parameters. Applications with requirements outside of the pre-determined parameters will be processed as a normal application. Service providers will be given up to six months for project completion.

List of items under Green Lane as at March

No
Equipment/Services
1
Mechanised Shower Trolley
2
Automated Showering System
3 Hand-held Scrubber
4 Ride-on Scrubber
5 Ride-on Sweeper
6 Therapeutic Robot (for management of dementia clients)
7 Inventory Management System
8 Automated Rotary Wok
9 Combi Oven
10 Industrial Dishwasher
11 Industrial Food Processor
12 Electronic Pill Crusher
13 Bladder Scanner
14 Macerator (for bedpans)
15 Upgrade to Electrical Beds
16 Ceiling Hoist for Rehabilitation
17 Motorised Upper & Lower Limbs Pedal Exerciser
18 Pneumatic Rehabilitation System
19 Portable Interactive Training Device
20 Virtual Rehabilitation System
21 Video Consultation System
22 Telepresence Robot
23 Bed Exit Sensor System
24 Vital Signs Monitoring (with integration to existing clinical IT system)
25 Visitor Management System
26 Ceiling Hoist for Transfer
27 Patient Lifter (with option for attached weighting scale)
28 Sitting Transfer Aid
29 Standing Transfer Aid
30 Set up for Centralised Medication Packing Service
31 Chef Partnership Programme

To apply, please contact us for the HPF Green Lane application form(s). Only completed application forms with the required details will be accepted.

Queries

To apply or if you have further enquiries, please contact us at 6603 6800 or email hpf@aic.sg.

Need more help?

EMAIL

Send us your enquiry

CALL

AIC Hotline
Mon – Fri: 8:30 am – 8:30 pm
Sat: 8:30 am – 4.00 pm

VISIT

Visit the AIC Link branch
nearest to you

Loading…

Shot by

Email us to request to use this photo

Related images